Bored Piers

Does bored pier concrete need a specific slump for pouring into the hole?

Yes — pouring into a narrow, deep hole genuinely needs a more flowable mix (a higher slump) than a standard slab pour, so the concrete fully fills the pier without leaving voids or getting stuck partway down.

This is a genuine specification your concrete supplier and contractor manage on the day, matched to your pier’s depth and diameter, not something left to whatever mix happens to be on the truck.

Concrete Mix Ratios Explained →

Ready To Get Started?

Request a free, no-obligation quote and our team will assess your site and provide an accurate, fixed price.